by Trombe | Jul 19, 2024
marylebone park house A basement extension linking the main townhouse to the mews house. Due to the split levels a fire rated structurally glazed box is on the higher level providing a secure enclosure down to the floor below via a bespoke staircase with shaped...
by Trombe | Jul 19, 2024
Sevenoaks Stepped House Trombe completed a full design service from the initial design through each of the RIBA stages including planning, building control, technical design and through to the installation. A challenge in terms of design and installation was that the...